Friday, August 31, 2018
Thursday, August 30, 2018
August 30 blasting postponed to August 31
The contractors have just notified us that the blasting scheduled for August 30 has been postponed until August 31.
Wednesday, August 29, 2018
Blasting scheduled for Thursday, August 30
On
Thursday, August 30, blasting will be conducted near Springlot Drive on the
Kendal campus at 10:00 a.m., 12 noon, and 2:30 p.m.
No blasting today, Wednesday, 8/29 at Kendal
There will be no blasting today at Kendal. Wednesday, 8/29.
Tuesday, August 28, 2018
Construction update 8/28
The
construction crews have identified a rock formation that must be removed in
order to install sewer and water infrastructure in an area on the Kendal
property that abuts the homes on Rebel Ridge Road. Having weighed the options, it has been determined
that blasting will be used to remove the rock.
The
contractor has made arrangements for additional surveys to be conducted on the
homes located at 112, 110, 108, 106, and 104 Rebel Ridge Road even though they
are located outside the 300 foot blast radius.
The surveyors plan to be in the neighborhood on Friday, August 31st
to perform the surveys.
Blasting is
likely to begin after Labor Day and will continue intermittently for about two
weeks. The blasting contractor will
adhere to all previously established blasting protocols.
Regular
updates regarding blasting activity are communicated via the Kendal
Construction Blog and using email and text messaging. To receive communications from Kendal please
provide your email address and/or phone number for texting to Julia Skare, the
Owners Representative for Kendal. Julia
may be reached by phone at 434-390-8956 or by email at juliaskare@gmail.com. Please do not hesitate to reach
out to Julia if you have questions or concerns regarding the project.
Friday, August 24, 2018
The construction crew will be working on Saturday, August 25th
The construction crew will be working on Saturday, August 25th
Friday, August 17, 2018
Saturday, August 18
Weather permitting, work will continue on the Kendal construction site on Saturday, August 18.
Thursday, August 16, 2018
No blasting until further notice
There will be no blasting at the Kendal construction site until further notice.
Wednesday, August 15, 2018
Blasting today at the Kendal site approx. 11 and 2
Blasting today Wed. 8/15 at the Kendal site approximately 11:00 and 2:00
Tuesday, August 14, 2018
Blasting today, August 14
Blasting will be conducted at Kendal today at 11:30 a.m. and 2:30 p.m. near Springlot Drive (close to the Webster Center.)
Monday, August 13, 2018
Blasting postponed until Tuesday, August 14
The blasting event that was scheduled for today has been postponed until tomorrow, Tuesday, August 14. This will be conducted close to Springlot Drive which is close to the Webster Center on the Kendal campus.
Friday, August 10, 2018
Blasting anticipated next week
Blasting is expected near Springlot Drive next week. More details as they become available.
Construction Update August 10, 2018
Excavation for the Cottages and
Main Facility sites continues.
Installation of water main has begun for the Cottages, several cottage pad
sites are complete, and the first foundation is
planned to be poured August 10.
Work to break up the rock on Sediment
Basin #2 (Rebel Ridge area)
continues. The excavation of the pond is expected to continue for the next
couple of weeks.
Blasting is expected to resume the week of August 13, with
the blast to take place in the vicinity of the
Cottage site construction trailer.
A determination as to additional
need for blasting for the stormwater,
sanitary and water main installation at the east end of the property (Rebel Ridge area) and adjacent to the Health Centers is
pending. All options are being considered.
Friday, August 3, 2018
Work on Saturday, August 4
Weather permitting, work will continue on the Kendal construction site on Saturday, August 4.
Subscribe to:
Posts (Atom)