Friday, October 19, 2018
Monday, October 15, 2018
No blasting October 15 and 16
There will be no blasting on the Kendal construction site on Monday, October 15 and Tuesday, October 16.
Friday, October 12, 2018
Storm Update
Kendal at Lexington staff spent this fair weather day
conferring with representatives from the City of Lexington, Rockbridge County,
Dominion Power, Spectrum engineers, and the Nielsen construction team to
evaluate the impact of yesterday’s torrential rains on our construction
project. We have been very fortunate to have experienced limited damage.
We expect that recommendations regarding our storm water management system to
be forthcoming and electrical repair work on our campus to occur next week.
We will provide additional information as it becomes available.
Thursday, October 11, 2018
Statement of Kendal at Lexington Regarding Flooding Due to Heavy Rain
October 11, 2018
3:00 pm
Due to the unusual amount of
rainfall, there has been a breach of water retention mechanisms on Kendal’s
construction worksite and water is flowing into some neighboring areas. Kendal
at Lexington regrets this situation and is actively working with the City of
Lexington, project contractors and engineers to assess and alleviate the issue.
Per
requirements, sediment basins are designed to contain 134 cubic yards of water
per acre of disturbed area. The water management installations were designed in
excess of that requirement. It is suspected the torrential rains we
received today were of an historic nature and exceed expectations.
Kendal at
Lexington’s property has been affected as well. All hands are on deck to
address the situation.
Please
contact Executive Director Mina Tepper at (540) 463-1910 with questions or
concerns. Updates will be posted on the blog at http://kalexmasterplanupdate.blogspot.com.
Monday, October 8, 2018
Blasting today, Monday, October 8
One blasting event is scheduled for today, Monday, October 8, at 2:00 p.m. near the center of the loop road.
Friday, October 5, 2018
Thursday, October 4, 2018
Kendal's Construction Update Blog
This
blog was created to post photos and updates of the progress on our current expansion and renovation project. We have discovered that this is not an ideal venue for communicating
time sensitive information as it only updates once a day. Blasting
notices will continue to be posted as promised, but please make sure you are
included in the e-mail or text list if you want timely
notices. You can contact Becky Edmondson at bjedmondson@kalex.kendal.org or
(540) 458-3782 to be added to these lists.
Stay
tuned for more interesting information about the construction project!
Wednesday, October 3, 2018
Blasting today, October 3
Blasting is anticipated at approximately 11:30 a.m. and 2:00 p.m. today, October 3, near Rebel Ridge.
Tuesday, October 2, 2018
Monday, October 1, 2018
Blasting today, October 1
Blasting will be conducted near Rebel Ridge today at approximately 11:00 a.m. and 2:00 p.m.
Friday, September 28, 2018
No blasting today, September 28
No blasting today, Friday, September 28, at the Kendal construction site.
Wednesday, September 26, 2018
Additional blast scheduled for September 26
An additional blast event will be conducted at approximately 3:00 p.m. on Rebel Ridge.
Blasting today 9/26 on Rebel Ridge
Blasting today, 9/26, approximately 11:00 and 2:00 on Rebel Ridge
Tuesday, September 25, 2018
Blasting today Sept. 25th on Rebel Ridge approximately 11:30 and 2:00
Blasting today Sept. 25th on Rebel Ridge approximately 11:30 and 2:00 at Kendal
Monday, September 24, 2018
Thursday, September 20, 2018
Blasting today, September 20 at Kendal
Blasting will be conducted today, Thursday, September 20, at 11:30 a.m. and 2:00 p.m. by Rebel Ridge.
Tuesday, September 18, 2018
Work behind Rebel Ridge
The construction crew will be
drilling near Rebel Ridge tomorrow, Wednesday, September 19, and we anticipate
blasting on Thursday, September 20. We will have more information after
drilling is completed about specific days/times.
No blasting today, September 18
No blasting will be conducted at the Kendal construction site today, Tuesday, September 18.
Friday, September 14, 2018
Thursday, September 13, 2018
No blasting today, September 13
There will be no blasting today, Thursday, September 13, on the Kendal construction site.
Wednesday, September 12, 2018
Blasting today, September 12
Blasting will be conducted today, September 12, at 11:00 a.m. and 1:00 p.m. near Springlot Drive.
Tuesday, September 11, 2018
Monday, September 10, 2018
Friday, September 7, 2018
Wednesday, September 5, 2018
Blasting today, September 5
Blasting is scheduled for 11:30 a.m. and 2:00 p.m. today behind the Borden Center.
Tuesday, September 4, 2018
Blasting today, September 4
Blasting is scheduled for today, Tuesday, September 4, at 11:00 a.m. and 1:30 p.m. near Springlot Drive.
Friday, August 31, 2018
Thursday, August 30, 2018
August 30 blasting postponed to August 31
The contractors have just notified us that the blasting scheduled for August 30 has been postponed until August 31.
Wednesday, August 29, 2018
Blasting scheduled for Thursday, August 30
On
Thursday, August 30, blasting will be conducted near Springlot Drive on the
Kendal campus at 10:00 a.m., 12 noon, and 2:30 p.m.
No blasting today, Wednesday, 8/29 at Kendal
There will be no blasting today at Kendal. Wednesday, 8/29.
Tuesday, August 28, 2018
Construction update 8/28
The
construction crews have identified a rock formation that must be removed in
order to install sewer and water infrastructure in an area on the Kendal
property that abuts the homes on Rebel Ridge Road. Having weighed the options, it has been determined
that blasting will be used to remove the rock.
The
contractor has made arrangements for additional surveys to be conducted on the
homes located at 112, 110, 108, 106, and 104 Rebel Ridge Road even though they
are located outside the 300 foot blast radius.
The surveyors plan to be in the neighborhood on Friday, August 31st
to perform the surveys.
Blasting is
likely to begin after Labor Day and will continue intermittently for about two
weeks. The blasting contractor will
adhere to all previously established blasting protocols.
Regular
updates regarding blasting activity are communicated via the Kendal
Construction Blog and using email and text messaging. To receive communications from Kendal please
provide your email address and/or phone number for texting to Julia Skare, the
Owners Representative for Kendal. Julia
may be reached by phone at 434-390-8956 or by email at juliaskare@gmail.com. Please do not hesitate to reach
out to Julia if you have questions or concerns regarding the project.
Friday, August 24, 2018
The construction crew will be working on Saturday, August 25th
The construction crew will be working on Saturday, August 25th
Friday, August 17, 2018
Saturday, August 18
Weather permitting, work will continue on the Kendal construction site on Saturday, August 18.
Thursday, August 16, 2018
No blasting until further notice
There will be no blasting at the Kendal construction site until further notice.
Wednesday, August 15, 2018
Blasting today at the Kendal site approx. 11 and 2
Blasting today Wed. 8/15 at the Kendal site approximately 11:00 and 2:00
Tuesday, August 14, 2018
Blasting today, August 14
Blasting will be conducted at Kendal today at 11:30 a.m. and 2:30 p.m. near Springlot Drive (close to the Webster Center.)
Monday, August 13, 2018
Blasting postponed until Tuesday, August 14
The blasting event that was scheduled for today has been postponed until tomorrow, Tuesday, August 14. This will be conducted close to Springlot Drive which is close to the Webster Center on the Kendal campus.
Friday, August 10, 2018
Blasting anticipated next week
Blasting is expected near Springlot Drive next week. More details as they become available.
Construction Update August 10, 2018
Excavation for the Cottages and
Main Facility sites continues.
Installation of water main has begun for the Cottages, several cottage pad
sites are complete, and the first foundation is
planned to be poured August 10.
Work to break up the rock on Sediment
Basin #2 (Rebel Ridge area)
continues. The excavation of the pond is expected to continue for the next
couple of weeks.
Blasting is expected to resume the week of August 13, with
the blast to take place in the vicinity of the
Cottage site construction trailer.
A determination as to additional
need for blasting for the stormwater,
sanitary and water main installation at the east end of the property (Rebel Ridge area) and adjacent to the Health Centers is
pending. All options are being considered.
Friday, August 3, 2018
Work on Saturday, August 4
Weather permitting, work will continue on the Kendal construction site on Saturday, August 4.
Friday, July 27, 2018
Construction work on Saturday, July 28
Work will continue at the Kendal construction site on Saturday, July 28.
Tuesday, July 24, 2018
No blasting July 24 - 28
Blasting
at the Kendal construction site behind Rebel Ridge Road has been completed,
barring any unforeseen issues. Thank you for your patience and
cooperation.
Monday, July 23, 2018
Friday, July 20, 2018
Blasting at approximately 12:00 today July 20 at the Kendal site
Blasting at approximately 12:00 today July 20 at the Kendal site
Blasting approximately 10:30 at the Kendal site today, July 20th Friday
Blasting approximately 10:30 at the Kendal site today, July 20th Friday
Blasting today Friday. 7/20 approximately 11:00 and 1:00
Friday 7/20. Blasting today approximately 11:00 and 1:00 at the Kendal site.
Thursday, July 19, 2018
No blasting today at the Kendal site. Thurs. 7/19
There will be no blasting today at the Kendal site. Thurs. 7/19
Wednesday, July 18, 2018
2:30 pm blasting event canceled
The blasting scheduled for today, Wednesday, July 18, at 2:30 p.m. has been canceled.
Blasting Wed. 7/18 approximately 12:50 at Kendal site
Wed. 7/18. Blasting approximately 12:50 at Kendal site
Wed. 7/18, Blasting approximately at 10:30 at Kendal site
Wed. 7/18, blasting approximately at 10:30 at the Kendal site
Blasting today 7/18 at Kendal. Approx. 10:30, 1:00 and 2:30
There will be blasting today Wed. 7/18 at the Kendal site. Approximately 10:30, 1:00 and 2:30
Tuesday, July 17, 2018
Monday, July 16, 2018
Blasting approximately 10:30 at Kendal site Mon. 7/16
Blasting at the Kendal site approximately 10:30 today 7/16
Blasting today July 16, 2018 Aprroximately 10:30, 1:00 and 3:30
Blasting today July 16th at the Kendal site. Approximately 10:30, 1:00 and 3:30
Friday, July 13, 2018
Saturday construction July 14th from 8-5
There will be construction going on at the Kendal Site this Saturday July 14th from 8-5
Blasting this afternoon July 13th has been cancelled
Blasting is cancelled for this afternoon July 13th.
Blasting will occur approximately 11:00 today July 13th
Blasting will occur approximately 11:00 today July 13th
Blasting today 7/13
There will be blasting at the Kendal Site approximately at 11:30 and 2:30 today 7/13.
Thursday, July 12, 2018
No blasting today, Thursday, July 12
Blasting will NOT occur today, Thursday, July 12, on the Kendal construction site.
Wednesday, July 11, 2018
Blasting approximately at 3:30 today
Blasting will occur approximately at 3:30 at the Kendal construction site today
Blasting today July 11th
Blasting will occur today Wednesday, July 11th, approximately 12 noon and 3:30 p.m. at the Kendal Construction site.
Tuesday, July 10, 2018
No blasting today, July 10
Blasting will not occur today, Tuesday, July 10, on the Kendal construction site.
Monday, July 9, 2018
Blasting today, July 9, at 11:30 a.m. and 2:30 p.m.
Blasting today, July 9, 11:30 a.m. and 2:30 p.m.
Blasting today, Monday, July 9
Today, Monday, July 9, blasting is expected to occur at approximately 11:30 a.m. and 2:30 p.m. on the Kendal construction site.
Friday, July 6, 2018
No blasting today, Friday, July 6
Blasting will not occur today, Friday, July 6, on the Kendal construction site.
Thursday, July 5, 2018
No blasting today, July 5
Blasting will not occur today, Thursday, July 5, on the Kendal construction site.
Friday, June 29, 2018
Stop Work Orders Rescinded
General work at Kendal will resume on July 2. Blasting may resume on July 5, with the following conditions:
Kendal will:
The contractor will:
Kendal will:
- continue notifications by e-mail and blog postings,
- add text messaging upon request,*
- send messages in the morning with anticipated blast times,
- send follow-up messages approximately 20 minutes prior to each blast.
The contractor will:
- replace the siren with an air horn and increase the decibel level,
- limit the number of bores of each blasting round,
- place a minimum of two feet of overburden (soil to deaden the impact) on top of the blasting round, and
- cover the overburden with two layers of blast matting prior to detonation.
*If you would like to be added to the text notification group, please contact Becky Edmondson at bjedmondson@kalex.kendal.org.
Friday, June 22, 2018
Work at Kendal June 23
There will be no work in the City of Lexington this Saturday, but the contractors will be working on the sediment basin #3 on Kendal property located in Rockbridge County behind Sycamore Lane.
Tuesday, June 19, 2018
Additional methods of communication
Dear Neighbor,
In addition to posting
construction updates, including blasting information, on the Kendal blog and
sending e-mails, Kendal will offer texting as an additional option to receive
notices regarding blasting at Kendal. Kendal
will need to have your cell phone number to be able to send the texts.*
Additionally, if you do
not use e-mail, the internet or texts, please notify us if you would like a
phone call to receive the information.
Again, please provide your phone number.*
Identical information will
be provided through all of these methods.
Sincerely,
Mina Tepper
Executive Director
*Please contact Becky
Edmondson to add your phone number to a group text and/or phone call list. You can reach her by phone at (540) 458-3782
or by e-mail at bjedmondson@kalex.kendal.org. Please indicate your preference of text or phone
call notification.
Monday, June 18, 2018
Blasting incident report
At the time of the last posting,
Kendal misunderstood the investigation process. The Fire Marshal is
responsible for the investigation and will prepare the official report.
Thursday, June 14, 2018
Blasting incident on June 13
Kendal at Lexington is
committed to carrying out construction and renovations on our campus in the
safest possible manner. Yesterday when Nielsen Builders informed us that a
blast did not go as planned, we immediately halted all further work and began
investigating what had gone wrong. We
are deeply thankful that no injuries resulted from this mishap, and we are
working to determine what caused the problem.
We were grateful to have
the expertise of the Fire Marshal on site at the time, and before the blast
Kendal had been assured that all safety requirements had been taken into
account. The impact of this event on our neighbors' sense of safety and well-being is a
very serious issue, and we will be communicating with them about what happened
before work resumes.
We have directed Nielsen
Builders to advise Kendal of the result of their investigation, and we expect
to receive that information by close of business on Friday, June 15. We will
not allow any further blasting until we can ensure that it can be done in a completely
safe and controlled manner.
Again, our apologies.
Wednesday, June 13, 2018
Blasting suspended at Kendal 6 13 18
At today’s event all protocols, including the use of warning
sirens, were followed, but there was an unexpected occurrence with the
blast. The Fire Marshal was present and is assisting with an
investigation. All blasting has been suspended until the
investigation is complete and we are comfortable that we are proceeding
safely.
Our apologies to our neighbors.
Blasting today, June 13, at approximately 2:00 p.m.
The contractors have informed us that they plan to blast at Detention Basin #2 (behind Rebel Ridge) today at approximately 2:00 p.m., weather permitting.
Tuesday, June 12, 2018
Blasting planned for today, June 12, has been cancelled.
Due to the mud, there will be no blasting at Kendal today.
Thursday, June 7, 2018
No blasting on June 7 or June 8
The contractors will not be conducting any blasting today or tomorrow.
Wednesday, June 6, 2018
June 6 Construction Update
The contractors have notified us that they will be blasting at approximately 3:00 p.m. today, Wednesday, June 6.
Monday, June 4, 2018
Construction update June 4
There will be one blast today at approximately 3 p.m. at Detention
Basin #1 (near Confederate Cove).
Since it has finally stopped raining, additional blasts will
most likely occur this week. Details as
soon as they become available.
Friday, June 1, 2018
No blasting today, June 1
The contractors have just
informed us that there will be no blasting today, Friday, June 1.
Thursday, May 31, 2018
Detention Basin #1 near Confederate Cove
Due to the unusual amount of rain, there may be several more
small blasting events before the detention basin can be completed.
Construction update, May 31
We anticipate blasting today, Thursday, May 31, in the
afternoon. The time will depend upon the
weather.
Additional information will be posted as it becomes available.
Wednesday, May 30, 2018
Construction Update May 30
The contractors are planning to conduct one blast today in
Detention Basin #1 (by Confederate Cove), if the rain holds off. They anticipate that it will occur at approximately
2:30 p.m.
Tuesday, May 29, 2018
Blasting today, May 29
The contractors have just notified us that they will proceed with blasting this afternoon, most likely between 2 and 3 p.m. If we get additional information prior to the blast, I will pass it along.
Friday, May 25, 2018
For safety reasons
Just a quick reminder . . .
We will all be spending more
time outside as the weather improves and children are out of school for the
summer. It is important for everyone’s safety that all
of us avoid the Kendal construction area. No unauthorized visitors should
be on any portion of the site that is fenced and/or marked No Trespassing.
Thank you for your
cooperation.
Thursday, May 24, 2018
Construction Update May 24
There will be no blasting on the construction site at Kendal
tomorrow, May 25.
All work will be suspended on Monday, May 28, for the
Memorial Day holiday.
Wednesday, May 23, 2018
Construction Update May 23
There will be no blasting
today, Wednesday, May 23. We anticipate that there will be blasting
tomorrow; more information as it becomes available.
Tuesday, May 22, 2018
No blasting, Tuesday, May 22
The contractors report, as of 9:00 a.m. this morning, that no blasting is planned for today, Tuesday, May 22.
Monday, May 21, 2018
Blasting Information
Upcoming Blasting:
Blasting is scheduled for
the week of May 21-25, 2018. Blasting is
expected to occur near Sycamore Lane, Confederate Cove and Rebel Ridge. All is dependent on weather, site conditions
and equipment.
Time of Day:
Blasting events are planned
between the hours of 9AM to 4PM in accordance with the permit. Only under unusual circumstances and with the
approval of the Fire Marshal would blasting occur outside of this range.
The timing and frequency
of the blasting events are determined daily and may change due to factors such
as weather, site conditions and equipment.
Warning Sirens:
Sirens are sounded prior
to and after each blast event. The
sirens are intended to clear the site work zone (300’ radius).
Sirens may not be heard by
persons outside the work zone.
Conditions such as distance, wind, topography and location of the blast
may make the siren inaudible to persons outside this work zone.
Compliance:
Blasting events are monitored
for regulatory compliance by the City of Lexington Fire Marshal and/or City of
Lexington Building Official.
The blasting company has
controlled and limited the size of each blasting event to be within approved
regulatory guidelines
Blasting occurs only when
alternate solutions have been explored and blasting has been determined to be
the better alternative.
Individual neighbor
concerns are being logged, acknowledged and attempts at contact have been
made. Follow up contacts have occurred.
Contact for Questions or Concerns: Julia Skare,
Kendal’s Project Owner’s Representative, 434-390-8956, juliaskare@gmail.com
Updates are
available at: http://kalexmasterplanupdate.blogspot.com
Friday, May 18, 2018
Construction Update for Monday, May 18
Blasting is scheduled to occur on the property behind Sycamore Lane (on the Kendal Campus) on Monday, May 21, at approximately 3:00 p.m., weather permitting.
No blasting today, Friday, May 18
Due to weather conditions, there will be no blasting at Kendal today, May 18.
Thursday, May 17, 2018
Construction Update May 17
The contractors have informed us that there will be no blasting today, Thursday, May 17.
Monday, May 7, 2018
Construction Update May 7, 2018
The contractors have notified us that, weather permitting,
they anticipate two blasting events tomorrow, May 8. The first will take place at approximately
11:30 a.m. and the second is scheduled for 3:00 p.m.
Thank you again for your patience.
Thursday, May 3, 2018
Update May 3, 2018
To date, blasting has occurred only twice, with both
occurrences on Tuesday of this week – one in the late morning and another in
the afternoon. The seismographic readings were significantly below advisable limits.
Lexington professionals responsible for the oversight of such events were
present.
There was no blasting yesterday and, weather and conditions
permitting, blasting is planned for today at approximately 11:00 a.m.
Wednesday, May 2, 2018
Update May 2, 2018
Weather permitting, blasting will continue for the remainder of the week and into next week.
Wednesday, April 25, 2018
Blasting Update, Wednesday, April 25
Notice to Kendal
Residents and Neighbors
Blasting Update
Wednesday, April 25th
In the process of developing the
water management system, it has become necessary to remove rock by
blasting. The blasting will be occurring
on the northwest area of our campus in the area abutting Confederate Cove. The blasting may begin as early as Friday,
April 27th at this location.
Weather permitting, blasting may occur periodically throughout the next
week. Additional information will be
shared as it becomes available.
Just before the contractor conducts
the blast, a siren will be sounded.
There will be three (3) short 20 second blows before each blast. When the blast is completed, one long horn
will be sounded as the all clear signal after which normal work will resume.
Please be reminded that fences
currently demark the work site. “No Trespassing”
signs have also been posted. For your
personal safety and wellbeing, please do not enter the work areas without
permission and appropriate safety equipment.
Kendal regrets this inconvenience and
thanks you in advance for your patience.
If you have any particular questions or concerns, please contact Julia
Skare, Kendal’s owner’s representative at juliaskare@gmail.com or 434-390-8956.
Wednesday, April 18, 2018
Fences
The quiet phase of our
expansion and renovation project is over!
With the approval from the Department of Environmental Quality (DEQ) in
hand, Kendal at Lexington is marching forward in double time.
Many fences have popped up
all over the property. Some of the
fences are erected for safety reasons, demarking the construction zones and are
intended to discourage individuals from entering the area without permission
and safety equipment. A second set of
silt fences are being built to limit the undesired movement of soil.
And, as you can see, the
relocation of soil has begun. Among the
first projects to be tackled is the development of the protective storm water
drainage and detention basin system on the portion of the property located in
the City of Lexington.
You may also notice the
creation of a temporary roadway extending from the ridge towards Kendal Drive
and then looping around behind the first Sycamore Lane cottage towards the
newly acquired property. This is the
route that will be used to relocate the excess soil on the property behind the
cottages.
In preparation for the
additions to the Borden and Webster Centers and the new cottage construction on
the ridge, substantial utility work is being addressed involving the relocation
and installation of gas, water, and electrical lines.
We ask for your
patience. It will be several months of
noisy, dusty, soil relocation before the new construction begins. Stay tuned.
Friday, April 13, 2018
Site work begins
We are officially in "build mode" this week. Silt fences are being installed, and soil relocation will begin shortly. Preparation of the water detention ponds will be the first order of business.
Wednesday, April 4, 2018
Update - April 4, 2018
Construction Update
Wednesday, April 04,
2018
With
approval from the Department of Environmental Quality (DEQ), Kendal at
Lexington will be moving from the quiet, planning phase to the active, dusty,
and noisy site development phase. Heavy
equipment has begun to arrive. We can
look forward to the construction of silt fences and the sound of trucks
relocating excess soil.
During the
construction, Kendal residents may expect to have the water turned off on about
three occasions in the near future, with the first occurring as soon as
Tuesday, April 10th. We
anticipate that the water may be shut off for as long as 4 hours between 1:00
PM and 5:00 PM. At this time, we are
uncertain as to the areas that will be without water; we will let you know the
specifics as soon as we receive the final plans.
Please be
patient with us.
Tuesday, April 3, 2018
DEQ approval
Late Friday afternoon we received word from the Department
of Environmental Quality that our project has been approved!!!
Tuesday, February 27, 2018
Test Email Subscription
We have received notice that some may not be receiving the email blog post notification.
Please confirm you received this post by emailing jlbuhler@kalex.kendal.org
Please confirm you received this post by emailing jlbuhler@kalex.kendal.org
Pre-construction Home Surveys
Construction
will soon be underway at Kendal at Lexington.
Blasting may or may not be necessary, but in case it is, VCE, Inc. has
been hired by Blue Ridge Rock Services to perform pre-construction surveys on
specific homes surrounding the construction project. Engineers from Spectrum Design have determined which homes will be surveyed.
A
pre-construction survey consists of documenting the current condition of the
interior and exterior of a home prior to blasting using still photographs,
diagrams or video. This service is
performed at no cost to the owner and benefits both the property owner and the
construction company by providing a benchmark if any changes in the condition
have occurred. Of course, owners have the
right to refuse the inspection.
If you have received a letter regarding these inspections, please contact VCE as soon as possible to schedule your survey. If you have not been contacted, no action is necessary at this time.
Subscribe to: